|Table of Contents|

A Study on Personnel Configuration in Product Data Management(PDF)

《南京理工大学学报》(自然科学版)[ISSN:1005-9830/CN:32-1397/N]

Issue:
2001年04期
Page:
395-399
Research Field:
Publishing date:

Info

Title:
A Study on Personnel Configuration in Product Data Management
Author(s):
LiDongbo LinHaifan HanXianglan XuPing SongZhigang
School of Manufacturing Engineering,NUST,Nanjing 210094
Keywords:
data management coupling algorithms personnel conf ig urat ion project management
PACS:
C931.3
DOI:
-
Abstract:
In this paper , a coupling arithmetic of personnel conf igurat ion is given by means of establishing the task model , the personnel model and the relation model of task and personnel. Based on task disassembly , an arithmet ic of netw ork planning is given. By means of reconf igurat ing the personnel in the key path, the personnel configuration is optimized. An example of personnel conf ig urat ion in product development project is also given.

References:

1 潘俊勇欧阳由, 万立. PDM 系统中任务管理的研究. 计算机辅助设计与制造, 1999( 5) : 40~42
2 Scheer A W. 企业管理的计算机化. 上海: 上海科学技术文献出版社, 1994

Memo

Memo:
-
Last Update: 2013-03-25