Optimization and Availability Evaluation of Spare Parts Project ofMulti-indenture System under Incomplete Cannibalization

《南京理工大学学报》(自然科学版)[ISSN:1005-9830/CN:32-1397/N]

Issue:
2012年05期
Page:
886-
Research Field:
Publishing date:

Info

Title:
Optimization and Availability Evaluation of Spare Parts Project ofMulti-indenture System under Incomplete Cannibalization
Author(s):
RUAN Min-zhi1LI Qing-min12PENG Ying-wu1WANG Shen1
1. Office of Research and Development;2. Department of Weaponry Engineering,Naval University of Engineering,Wuhan 430033,China
Keywords:
cannibalization multi-indenture system availability initial spare parts projectsupport effectiveness
PACS:
TP391
DOI:
-
Abstract:
In order to determine the initial spare parts project and exactly evaluate the equipment a-vailability for improving its support effectiveness,the optimization method for the initial spare partsproject is given according to the METRIC theory. For the complex equipment with multi-indenturestructure,the system availability evaluation model is established under the incomplete cannibalizationpolicy. The analysis method and flow of the equipment support effectiveness under the cannibalizationpolicy are studied. The equipment availability is calculated under the different cannibalizationpolicies by an example. The VMETRIC software simulation results show that the error between themodel and the simulation is less 5%,and the research can provide support for military equipmentmanagers to design reasonable support projects.

References:

[1]Shah J,Avittathur B. The retailer multi-item inventoryproblem with demand cannibalization and substitution[J]. International Journal of Production Economics,2007(106):104-114.
[2] De Haas H F M,Verrijdt J H C M. Target setting forthe departments in an aircraft repairable item system[J]. European Journal of Operational Research,1997(99):596-602.
[3] Yoon K B,Sohn S Y. Finding the optimal CSP inventorylevel for multi-echelon system in air force using randomeffects regression model [ J]. European Journal ofOperational Research,2007(180):1076-1085.
[4] 阮旻智,李庆民,彭英武,等. 串件拼修对策下多级维修供应的装备系统可用度评估[ J]. 航空学报,2012,33(4):658-665.Ruan Minzhi, Li Qingmin, Peng Yingwu, et al.Evaluation of equipment system availability for multi-echelon maintenance supply with cannibalization[ J].Acta Aeronautica et Astronautica Sinica,2012,33(4):658-665.
[5] Loo H L, Ek P C, Suyan T et al. Multi-objectivesimulation-based evolutionary algorithm for an aircraftspare parts allocation problem[J]. European Journal ofOperational Research,2008(189):325-341.
[6] Sleptchenko A,van der Heijden M C,van Harten A.Effects of finite repair capacity in multi-echelon,multi-indenture service part supply systems[J]. InternationalJournal of Production Economics,2002(79):209-230.
[7] Rustenburg W D,van Houtum G J,Zijm W H M. Spareparts management at complex technology-basedorganizations:An agenda for research[ J]. InternationalJournal of Production Economics,2001(71):177-193.
[8] 阮旻智,彭英武,李庆民,等. 基于体系保障度的装备备件三级库存方案优化[ J]. 系统工程理论与实践,2012,32(7):1623-1630.Ruan Minzhi, Peng Yingwu, Li Qingmin, et al.Optimization of three-echelon inventory project forequipment spare parts based on system support degree[J]. Systems Engineering Theory and Practice,2012,32(7):1623-1630.
[9] Shah J,Avittathur B. The retailer multi-item inventoryproblem with demand cannibalization and substitution[J]. International Journal of Production Economics,2007(106):104-114.
[10] Fisher W W,Brennan J J. Performance of cannibalizationpolicies in a maintenance system with spares,repair,andresource constraints [ J ]. Naval Research LogisticsQuarterly,1986,33(1):1-15.
[11] Fisher W W, Brennan J J. Model for cannibalizationpolicy performance comparisons in a complexmaintenance system[ A]. Proceedings of the SummerComputer Simulation Conference[ C]. San Diego,CA,USA:North-Holland,1985:585-589.
[12] Byrkett D L. Units of equipment available usingcannibalization for repair-part support [ J ]. IEEETransactions on Reliability,1985,34(1):25-28.
[13] Salman S,Cassady C R,Pohl E A,et al. Evaluating theimpact of cannibalization on fleet performance [ J].Quality and Reliability Engineering International,2007,24(4):445-457.
[14] Fisher W W. Markov process modeling of a maintenancesystem with spares,repair,cannibalization and manpowerconstraints[ J]. Mathematical and Computer Modeling,1990,13(7):119-125.
[15] 李羚伟,张建军,张涛,等. 面向任务的拼修策略问题及其求解算法[J]. 系统工程理论与实践,2009,29(7):97-104.Li Lingwei, Zhang Jianjun, Zhang Tao, et al. Missionoriented cannibalization policy problem and its solvingalgorithm [ J ]. Systems Engineering Theory andPractice,2009,29(7):97-104.
[16] Sung C S, Kim S H. Analysis of a multi-part sparesinventory system subject to ambiguous fault isolation[ J]. Journal of the Operational Research Society,2001,52(4):418-432.
[17] Cheung K L, Hausman W H. Multiple failures in amulti-item spares inventory model[J]. IIE Transactions(Institute of Industrial Engineers),1995,27(2):171-180.
[18] Sherbrooke C C. Optimal inventory modeling of system:multi-echelon techniques [ M]. 2nd ed. Boston, US:Artech House,2004.
[19] 王乃超,康锐,程海龙. 基于马尔科夫过程的备件库存动态特性分析[J]. 兵工学报,2009,30(7):984-988.Wang Naichao,Kang Rui,Cheng Hailong. Study on thedynamic characteristics of spare inventory based onMarkov process[J]. Acta Armanentarii,2009,30(7):984-988.