[1]阮旻智,李庆民,彭英武,等.不完全串件下多层次系统备件方案优化及其可用度评估[J].南京理工大学学报(自然科学版),2012,36(05):886.
 RUAN Min-zhi,LI Qing-min,PENG Ying-wu,et al.Optimization and Availability Evaluation of Spare Parts Project ofMulti-indenture System under Incomplete Cannibalization[J].Journal of Nanjing University of Science and Technology,2012,36(05):886.
点击复制

不完全串件下多层次系统备件方案优化及其可用度评估
分享到:

《南京理工大学学报》(自然科学版)[ISSN:1005-9830/CN:32-1397/N]

卷:
36卷
期数:
2012年05期
页码:
886
栏目:
出版日期:
2012-10-31

文章信息/Info

Title:
Optimization and Availability Evaluation of Spare Parts Project ofMulti-indenture System under Incomplete Cannibalization
作者:
阮旻智1李庆民12彭英武1王慎1
海军工程大学1. 科研部;2. 兵器工程系,湖北武汉430033
Author(s):
RUAN Min-zhi1LI Qing-min12PENG Ying-wu1WANG Shen1
1. Office of Research and Development;2. Department of Weaponry Engineering,Naval University of Engineering,Wuhan 430033,China
关键词:
串件拼修多层级系统可用度初始备件方案保障效能
Keywords:
cannibalization multi-indenture system availability initial spare parts projectsupport effectiveness
分类号:
TP391
摘要:
为了确定串件对策下装备的初始备件方案,以准确地评估可用度,提高装备的保障效能,该文根据METRIC 理论,给出了装备初始备件方案的优化,针对具有多层次结构的复杂装备,建立了不完全串件对策下的系统可用度评估模型。研究了串件对策下装备保障效能的分析流程和方法。通过算例给出了不同串件对策下装备的可用度结果,VMETRIC 仿真结果表明,模型与仿真结果的误差小于5%,说明该文研究可为装备管理人员制定合理的保障方案提供决策支持。
Abstract:
In order to determine the initial spare parts project and exactly evaluate the equipment a-vailability for improving its support effectiveness,the optimization method for the initial spare partsproject is given according to the METRIC theory. For the complex equipment with multi-indenturestructure,the system availability evaluation model is established under the incomplete cannibalizationpolicy. The analysis method and flow of the equipment support effectiveness under the cannibalizationpolicy are studied. The equipment availability is calculated under the different cannibalizationpolicies by an example. The VMETRIC software simulation results show that the error between themodel and the simulation is less 5%,and the research can provide support for military equipmentmanagers to design reasonable support projects.

参考文献/References:

[1]Shah J,Avittathur B. The retailer multi-item inventoryproblem with demand cannibalization and substitution[J]. International Journal of Production Economics,2007(106):104-114.
[2] De Haas H F M,Verrijdt J H C M. Target setting forthe departments in an aircraft repairable item system[J]. European Journal of Operational Research,1997(99):596-602.
[3] Yoon K B,Sohn S Y. Finding the optimal CSP inventorylevel for multi-echelon system in air force using randomeffects regression model [ J]. European Journal ofOperational Research,2007(180):1076-1085.
[4] 阮旻智,李庆民,彭英武,等. 串件拼修对策下多级维修供应的装备系统可用度评估[ J]. 航空学报,2012,33(4):658-665.Ruan Minzhi, Li Qingmin, Peng Yingwu, et al.Evaluation of equipment system availability for multi-echelon maintenance supply with cannibalization[ J].Acta Aeronautica et Astronautica Sinica,2012,33(4):658-665.
[5] Loo H L, Ek P C, Suyan T et al. Multi-objectivesimulation-based evolutionary algorithm for an aircraftspare parts allocation problem[J]. European Journal ofOperational Research,2008(189):325-341.
[6] Sleptchenko A,van der Heijden M C,van Harten A.Effects of finite repair capacity in multi-echelon,multi-indenture service part supply systems[J]. InternationalJournal of Production Economics,2002(79):209-230.
[7] Rustenburg W D,van Houtum G J,Zijm W H M. Spareparts management at complex technology-basedorganizations:An agenda for research[ J]. InternationalJournal of Production Economics,2001(71):177-193.
[8] 阮旻智,彭英武,李庆民,等. 基于体系保障度的装备备件三级库存方案优化[ J]. 系统工程理论与实践,2012,32(7):1623-1630.Ruan Minzhi, Peng Yingwu, Li Qingmin, et al.Optimization of three-echelon inventory project forequipment spare parts based on system support degree[J]. Systems Engineering Theory and Practice,2012,32(7):1623-1630.
[9] Shah J,Avittathur B. The retailer multi-item inventoryproblem with demand cannibalization and substitution[J]. International Journal of Production Economics,2007(106):104-114.
[10] Fisher W W,Brennan J J. Performance of cannibalizationpolicies in a maintenance system with spares,repair,andresource constraints [ J ]. Naval Research LogisticsQuarterly,1986,33(1):1-15.
[11] Fisher W W, Brennan J J. Model for cannibalizationpolicy performance comparisons in a complexmaintenance system[ A]. Proceedings of the SummerComputer Simulation Conference[ C]. San Diego,CA,USA:North-Holland,1985:585-589.
[12] Byrkett D L. Units of equipment available usingcannibalization for repair-part support [ J ]. IEEETransactions on Reliability,1985,34(1):25-28.
[13] Salman S,Cassady C R,Pohl E A,et al. Evaluating theimpact of cannibalization on fleet performance [ J].Quality and Reliability Engineering International,2007,24(4):445-457.
[14] Fisher W W. Markov process modeling of a maintenancesystem with spares,repair,cannibalization and manpowerconstraints[ J]. Mathematical and Computer Modeling,1990,13(7):119-125.
[15] 李羚伟,张建军,张涛,等. 面向任务的拼修策略问题及其求解算法[J]. 系统工程理论与实践,2009,29(7):97-104.Li Lingwei, Zhang Jianjun, Zhang Tao, et al. Missionoriented cannibalization policy problem and its solvingalgorithm [ J ]. Systems Engineering Theory andPractice,2009,29(7):97-104.
[16] Sung C S, Kim S H. Analysis of a multi-part sparesinventory system subject to ambiguous fault isolation[ J]. Journal of the Operational Research Society,2001,52(4):418-432.
[17] Cheung K L, Hausman W H. Multiple failures in amulti-item spares inventory model[J]. IIE Transactions(Institute of Industrial Engineers),1995,27(2):171-180.
[18] Sherbrooke C C. Optimal inventory modeling of system:multi-echelon techniques [ M]. 2nd ed. Boston, US:Artech House,2004.
[19] 王乃超,康锐,程海龙. 基于马尔科夫过程的备件库存动态特性分析[J]. 兵工学报,2009,30(7):984-988.Wang Naichao,Kang Rui,Cheng Hailong. Study on thedynamic characteristics of spare inventory based onMarkov process[J]. Acta Armanentarii,2009,30(7):984-988.

备注/Memo

备注/Memo:
收稿日期:2011-07-22修回日期:2011-12-21基金项目:总装预研基金作者简介:阮旻智(1983-),男,博士,讲师,主要研究方向:装备维修保障建模、仿真与优化,E-mail:ruanminzhi830917@ sina. com;通讯作者:李庆民(1957-),男,教授,博士生导师,主要研究方向:装备综合保障工程,武器对抗仿真等,E-mail:licheng0001@ hotmail. com。
更新日期/Last Update: 2012-11-26